Building in Faith - As God Provides.
We’re excited to step out in faith as we begin this next chapter for Calvary Chapel Belfast! Our vision is to build a permanent home for our church family—a place where God’s Word is taught, lives are transformed, and the Gospel continues to reach our community.
Pastor Greg’s heart has been to build as the Lord provides. Rather than relying on loans, we are trusting God to provide each step of the way through the faithful generosity of His people.
Below you will find estimated costs for some of our upcoming needs. As the Lord provides, we’ll continue moving forward, one step at a time. We invite you to prayerfully consider how you might be part of what God is doing through this exciting work.
Pastor Greg’s heart has been to build as the Lord provides. Rather than relying on loans, we are trusting God to provide each step of the way through the faithful generosity of His people.
Below you will find estimated costs for some of our upcoming needs. As the Lord provides, we’ll continue moving forward, one step at a time. We invite you to prayerfully consider how you might be part of what God is doing through this exciting work.
Or mail a check to
PO BOX 305 Belfast Maine, 04915
payable to CALVARY CHAPEL BELFAST
in the memo "Building Project"
PO BOX 305 Belfast Maine, 04915
payable to CALVARY CHAPEL BELFAST
in the memo "Building Project"
Construction Project Phase 1 Financial Aspects
Septic design/services
$1,500.00
Marc Swartz substantially reduced the cost by donating a large portion of his services.
Traffic study engineering
$1,011.98
Belmont Site Plan Permitting
$2,800
Building’s Structural Design Engineering
$18,000.00
Life safety plans and Fire Marshal application
Donated by BR Smith Associates
PAID IN FULL
$10,000.00
Tree Removal/Forestry work:
Donated by O'Reilly Forestry
PAID IN FULL
TBD
Wastewater coordination and site plan additions
$800.00
Draft site plan creation.
$3,240.00
Additional Area Mapping
$650.00
Civil Plan Set Creation
$4,590.00
MaineDEP stormwater permitting(SWAPP)
$8,100.00
Septic design/services
$1,500.00
Marc Swartz substantially reduced the cost by donating a large portion of his services.
Traffic study engineering
$1,011.98
Belmont Site Plan Permitting
$2,800
Building’s Structural Design Engineering
$18,000.00
Life safety plans and Fire Marshal application
Donated by BR Smith Associates
PAID IN FULL
$10,000.00
Tree Removal/Forestry work:
Donated by O'Reilly Forestry
PAID IN FULL
TBD
Wastewater coordination and site plan additions
$800.00
Draft site plan creation.
$3,240.00
Additional Area Mapping
$650.00
Civil Plan Set Creation
$4,590.00
MaineDEP stormwater permitting(SWAPP)
$8,100.00